Fictional event · blocked · Above the 100-guest working bands

Juniper House Autumn Supper

2026-10-17 · America/Denver · access 15:00 · doors 18:00 · end 22:00

Exception board

What still needs a decision

Each item says why it is here. None of these statuses certify safety, capacity, access, or compliance.

Next required decision

Build florals, schedule, and costs from the selected concept.

Open the decision

1 venue fact still unresolved

No structured venue facts are stored. That is unknown, not a pass.

Open venue reality

2 open risks on the register

Guest growth outruns current room assumption; Weather alternative has no decision protocol

Open risks

Budget state: quote

Quotes are on file and no committed amount is entered. A quote is not a commitment. Quoted minus recorded deposits. Not a commitment..

Open budget

No cues are entered

The run of show has no cue to follow. Blank was not turned into a schedule.

Add a cue

3 vendor or crew assignments not confirmed

Confirmed is a recorded status. It is not proof that a vendor received a message.

Open production

Closeout has not been recorded

The issued plan has not been marked delivered, so actuals are not the closeout record yet.

Open debrief

What is known

  • 110 guests. Above the 100-guest working bands. 110 guests is above the 100-guest working bands. The count stays valid. No sixth band was added.
  • 110 guests is above the 100-guest working bands. The count stays valid. No sixth band was added. Quantities were not enlarged.
  • No next decision is recorded.
  • No open assumptions are on the register.
  • No strategy selected

Above the 100-guest working bands

Decide next

No open decision is recorded.

Start here

Skip any step. The rest of the studio stays usable.

  • Recorded · Event name is on the record.
  • Recorded · Date, guest count, and currency are entered.
  • Still open · The guest promise is written.
  • Still open · At least one protected outcome is listed.
  • Still open · The largest current unknown is recorded.
  • Still open · A budget scenario exists.
  • Still open · The next decision is recorded.
  • Recorded · The first planning summary can be read from the record.

Scale

110 guests is above the 100-guest working bands. The count stays valid. No sixth band was added.

  • verify: 110 guests is above the 100-guest working bands. The count stays valid. No sixth band was added. Quantities were not enlarged.

When this changes

Compare scenarios

Rows are ordered by the entered budget target. A missing target stays last. No scenario is called best.

These money figures are the shared event lines. A scenario does not keep a separate ledger.

No scenarios yet. Add them from the existing scenario tools. Nothing was invented.

No contradiction is showing from the records entered so far.

Working guests

110

Above the 100-guest working bands. Issued figure stays 80.

Open decisions

  • Open flame permission
  • Ceiling height
  • Loading door width
  • What occupant load applies to this room in this event configuration, and which authority or posted certificate establishes it?

Open risks

  • Guest growth outruns current room assumption · critical
  • Weather alternative has no decision protocol · high

Professional command center

What can change the event

Production readiness1/4 confirmed or complete1 blocked

Changed since issue

3
  • Guest count changed after issue80 issued → 110 working
  • Setup estimate changed120 min issued → 150 min working
  • Quantities need rebuildThe working revision changed after issue and its quantities are not current.

Blocked

3
  • Legal occupant loadDo not treat the geometric dining allowance as legal capacity.Owner: venue · Due: 2026-10-03
  • Guest growth outruns current room assumptionThe 110-guest working draft exceeds the geometric dining allowance and legal occupancy is still unknown.Owner: studio · Due: 2026-10-02
  • Long-table and chair deliveryFinal count and route depend on room/guest reconciliation.Owner: Rentals lead

Overdue

0

Nothing currently registered.

Awaiting client

0

Nothing currently registered.

Awaiting venue

3
  • Legal occupant loadWhat occupant load applies to this room in this event configuration, and which authority or posted certificate establishes it?Owner: venue · Due: 2026-10-03
  • Open flame permissionAre the proposed candle vessels permitted in this room, under what containment rule, and who can approve the answer?Owner: venue · Due: 2026-10-05
  • Loading door widthWhat is the narrowest clear opening on the actual load-in path from vehicle to room?Owner: venue · Due: 2026-10-06

Financial exposure

2
  • Balance is unknownA figure this balance depends on is unknown, so no balance was shown.
  • Budget comparison is incompleteAn estimate total is unknown, so it is not compared with the budget envelope.

Approval

1
  • Approval: conditionalOpen flame is still unknown and is not approved. · Ceiling height is still unknown. · Loading door width is still unknown.

Unresolved unknowns

3
  • Legal occupant loadWhat occupant load applies to this room in this event configuration, and which authority or posted certificate establishes it?Owner: venue · Due: 2026-10-03
  • Open flame permissionAre the proposed candle vessels permitted in this room, under what containment rule, and who can approve the answer?Owner: venue · Due: 2026-10-05
  • Loading door widthWhat is the narrowest clear opening on the actual load-in path from vehicle to room?Owner: venue · Due: 2026-10-06

Upcoming decisions and production work

Client decision deadlineStored on the event record. It is not inferred from a constraint.
Venue decision deadlineStored on the event record. It is not inferred from a constraint.
Legal occupant loadWhat occupant load applies to this room in this event configuration, and which authority or posted certificate establishes it?
Open flame permissionAre the proposed candle vessels permitted in this room, under what containment rule, and who can approve the answer?
Loading door widthWhat is the narrowest clear opening on the actual load-in path from vehicle to room?
Terrace weather triggerWhat forecast condition and decision time moves the plan indoors?

Decision queue

  • Build florals, schedule, and costs from the selected concept.
  • Reconcile the guest change to 110. Old packets stay as issued.
  • 3 production dependencies are still open.

Issued guests

80

Open draft guests

110

Issued setup

120m

Draft setup 150m. Issued figure is frozen.

Guest change after issue

80 → 110. Fictional host revised the list from 80 to 110 after packets were issued.

  • Guest count 80 → 110.
  • Floral purchase quantities, bar expected output, rental counts, and cost totals need a rebuild.
  • Issued packets stay historical. They are not rewritten.
  • Seating allowance is 99 at 18 sq ft per guest. 110 exceeds it. Not a venue certification.

Rejecting records the decision. It does not rewrite issued packets or put the guest count back by itself.