Draft · fictional
Juniper House
2026-10-17 · America/Denver · version 16
- Build florals, schedule, and costs from the selected concept.
- Reconcile the guest change to 110. Old packets stay as issued.
- 3 production dependencies are still open.
Changed since issue
3- Guest count changed after issue80 issued → 110 working
- Setup estimate changed120 min issued → 150 min working
Blocked
3- Legal occupant loadDo not treat the geometric dining allowance as legal capacity.Owner: venue · Due: 2026-10-03
- Guest growth outruns current room assumptionThe 110-guest working draft exceeds the geometric dining allowance and legal occupancy is still unknown.Owner: studio · Due: 2026-10-02
Awaiting venue
3- Legal occupant loadWhat occupant load applies to this room in this event configuration, and which authority or posted certificate establishes it?Owner: venue · Due: 2026-10-03
- Open flame permissionAre the proposed candle vessels permitted in this room, under what containment rule, and who can approve the answer?Owner: venue · Due: 2026-10-05
Financial exposure
2- Balance is unknownA figure this balance depends on is unknown, so no balance was shown.
- Budget comparison is incompleteAn estimate total is unknown, so it is not compared with the budget envelope.